NNEGC “Energoatom”

Goals

Goals

of SE NNEGC ‘Energoatom’ on improvement and development of Integrated Management System for assuring safety for 2018

To supplement the established strategic goals and plans, and to improve and develop integrated management system (of safety, quality, ecology and labour protection) in the interests of safety assurance, SE ‘NNEGC ‘Energoatom’ establish the following goals by the end of 2018:

 

Item

Goals (tasks)

Ways of goals achievement

Expected results

 Responsible division

1

Ensure prevention of accidents in NPP operation

-absolute compliance with regulations, codes and  standards  on nuclear and radiation safety, specific permits and licenses for NPP power units operation  issued by the State Nuclear Regulatory Authority

-provision with material and financial resources

- training

Prevention of accidents in operation of SE NNEGC ‘Energoatom’s NPPs (a number of accidents is zero)

EDP,

EDNRS STS,

DSS,

SS NPP [1]

 

2

Ensure current safety level of NPPs, in terms of quantitative indicators, being not lower than that  of the previous year

-continuous monitoring and assessment of current safety level of NPPs

-development and implementation of measures on execution of recommendations received as a result of reviews.

Current safety level of NPPs, in terms of quantitative indicators, being not lower than that of the previous year

EDP, EDNRS STS,

DSS,

SS NPP

 

3

Ensure status of safety  culture, in terms of qualitative and quantitative indicators,  being not lower than that achieved the  previous year

-implementation of the Programme of specific actions  aimed at establishing and development of  safety culture at SE NNEGC ‘Energoatom’ for 2017-2018 PM-D-.0.03.531-17;

-interviewing of the  personnel about safety culture and its status

 

 

Status of safety  culture, in terms of qualitative and quantitative indicators,  being not lower than that achieved the previous year

Main Office, Separate Subdivisions  of SE NNEGC Energoatom

4

Ensure non-exceeding of the established reference levels of the personnel exposure 

-planning of exposure dose for each operation according to the approved list;

-implementation of measures on minimization of individual and collective exposure doses of the personnel based on ALARA principle.

 

Exposure dose indicators are lower than  or equal to reference levels

SS NPP

5

Observe  boundaries of allowed releases and discharges of contaminating substances

-environmental  monitoring

-environmental aspect management

 

Scopes of  releases and discharges of contaminating substances are lower than or equal to boundary scopes

EDNRS STS,

SS NPP

 

6

Prevent industrial accidents

-implementation of activities on hazard assessment and  development of cards of hazard identification and related  risks;

- review of labour protection status

-provision of personnel of separated subdivisions with protective clothing , footwear and individual and collective protection means and safety signs.

Number of industrial accidents are lower than or equal to the previous period indicators

Separate Subdivisions, DSS

7

Assure compliance of integrated management system, of SE NNEGC ‘Energoatom’ with international standards and best international practice

-performance of corrective measures

- timely conclusion of the agreement with the regulatory authority

-successful passing of the second post-certification audit

- Lack of critical non-compliances

- Number of non-compliances do not exceed that of the previous period

Executive Directorate for Quality and Control,  DSS,

Separate Subdivisions 

 

 Note:

  1. Strategic  (long-term)  objectives  of the main activity of SE NNEGC Energoatom as determined at the ‘Strategic Plan of Development of SE NNEGC ‘Energoatom’  for 2017-2021’ dated April 7, 2017  (based on KPI)  by  the areas of activity
  2. Current plans, goals and expected results of SE NNEGC Energoatom activity for 2018 are determined by Order #1 dated January 2, 2018.

 

 

President        / signed/               Y.O. Nedashkovskyi

 

[1] EDP –Executive Directorate for Production, EDNRS  STS- Executive Directorate for Nuclear and Radiation Safety and Scientific and Technical Support ,

DSS – Directorate for Safety Surveillance

SS NPP –Separate Subdivisions Nuclear Power Plants

 